Today I received a list of things that were either missing or not up to scratch in our pre production from Lorraine. So after our team meeting, in which I allocated jobs to Jake and I for the day, I began to change the proposal for the second time to meet the criteria.
As Perry was not in until lunch, I made the changes to his part of the proposal that were required. After printing copies off, to give to Lorraine, I also wrote the full dialogue for the narrative of our advert in the script. We planned to record the audio narrative for the advert today, but we were not able to use a Marantz Recorder in time. After returning from lunch, we got the remains of the character that Perry and Jake made when I was not in. We had to make the character again.
After practicing movement of the character the previous week, we had discovered that the wire frame in the character, used to give it stability, was made using thicker wire than required. Meaning that it was nearly impossible to move the character without the wire splitting the clay. We got the thinner wire and made the frame, but we were not able to fully coat the frame with the clay, as we ran out of time.
No comments:
Post a Comment